Ultraviolet sterilizer operation and maintenance

The daily operation and maintenance of the ultraviolet sterilizer mainly pay attention to the following points: 1. Operate according to the specified power supply voltage, check whether the power supply voltage meets the requirements, and the voltage of each phase is within 180V~220V to ensure that the ballast and lamp work normally. 2. Connect the inlet and outlet flanges as required. 3. Put the ultraviolet lamp tube straight into the quartz tube, insert the four-pin plug of the lamp tube, tighten the locking nuts at both ends, try to pass the water, and check whether there is any leakage.

4. The installation distance between the split type electric control box and the reactor should not exceed 5m to ensure the normal operation of the electronic ballast. 5. At least one end of the reactor has a maintenance space for the total length of the reactor, which is convenient for replacing the lamp tube. 6. Turn on the main power switch and check if there is any abnormality. The voltmeter indicates normal, the chronograph is working, and the lamp working indicator light is on.

7. When there is a fault, cut off the power supply to check whether the power supply voltage is normal; when the lamp is not on, try to replace the lamp, first take out the black wire buckle at the end, pull out the lamp, remove the lamp holder, and replace it with a new lamp Tube. 8. When the lamp still does not light up, try to replace the electronic ballast, remove the electronic ballast, and connect the new ballast according to the original wiring method. 9. If leakage is found at the lock nut of the reactor, the seal may be damaged or the quartz sleeve may be broken. Loosen the lock nut and replace the seal. Lock the nuts at both ends of the lower end, (be careful not to lose the seal) take out the bushing, pay attention to the operation of two people, one push and one pull, and prevent one end of the bushing from falling, hitting other bushings, and expanding the fault.

10. When the outlet head of the reactor is high, a check valve should be installed to prevent equipment damage. Boying Environmental Protection specializes in the production of water treatment equipment such as ultraviolet sterilizers. Welcome to call for exchanges and discussions! Poolking is the best swimming pool equipment manufacturer and supplier in China. Poolking exists to provide the highest quality swimming pool equipment while offering competitive pricing..

GET IN TOUCH WITH Us
recommended articles
News Application Products Transport
Wholesale Best workmanship Supplier with good price - Poolking
Poolking Wholesale Best workmanship Supplier with good price - Poolking
Poolking Best workmanship Supplier
----Poolking utilize serval world class production machines to produce the products, and strict quality control system for each products. It treats a small flaw with zero tolerance.
Not only good quality products, but also fast and satisfying after sales service for clients. Let the clients enjoy the clear water and comfortable services.
If Poolking’s products are same quality than others but higher prices, how can Poolking survive ? However Poolking can defeat other players and seize more market share.
Poolking is your best choice!
Using non metallic components fiberglass pressure tanks are rapidly replacing steel tanks in numerous applications. Fiberglass vessels offer several advantages in comparison with steel vessels .
Fiberglass vessels have a mechanical and chemical resistance superior to steel . Fiberglass tanks do not rust or corrode and are able to withstand damage from many types of water treatment chemicals.
---Poolking has a professional Quality Control team to guarantee each product is 100% inspected before packing. For example when the filter inner tank comes out, they will make a first water testing before bobbin wounding. After installation all the connections or manhole & sightglass, they will make the second water testing. During the packing procedure, QC team will inspect all the details like wounding, neck, internal resin and so on to make sure no leaking and without flaw.
After about 5~10days ,or when the reading of the pressure gauge on the pump side of the filter has increased by about 0.2bars since the last backwash , backwash the filter as follows:
1. Stop the pump
2.Close the valves on the suction and return lines.
3.Open the cover of the pump and empty the filter gasket .
4.Refit the cover
5.Open the valve to the drain outlet
6.Turn the lever to BACKWASH
7. Open the valves to the suction and return lines.
8.Start the pump .Rinse the filter for about 1 to 2 minutes until the water in the sight glass is clear .
NOTE : Any electric heater must be off .
9. Stop the pump
10. Turn the lever to RINSE , start the pump and rinse for about 15~30 seconds. Stop the pump and turn the lever to FILTER . This is the normal operating position .
11. Close the drain outlet valve and start the pump . Switch on the electric heater if any .
no data

Best swimming pool equipment manufacturer - Poolkin will continue for innovative management and excellent quality. Imagination will subvert the future, intelligent manufacturing will lead the era, that's the motto of Poolking!

If you have any question,please contact us.

Contact: Sandy

Email: sandy@poolking.co

Sales Hot line: +86-20-34982303

WhatsApp:+86-13922334815

Add: No. 80, Danan North Road, Dagang Village, Dagang Town, Nansha District, Guangzhou City (temporary business premises)

Copyright © 2025 Guangdong Poolking filtration equipment manufacturing co. Ltd. - www.poolking.co All Rights Reserved. | Sitemap
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect